Getting My Geyser Installation To Work

Table of ContentsEverything about Geyser InstallationGetting My Geyser Installation To WorkThe Greatest Guide To Geyser InstallationSome Ideas on Geyser Installation You Need To Know
In this article I will define the normal standard requirements of a noise, modern high pressure, straight setup. If you need detail, then I suggest that you have an appearance at the site (). For anyone seeking, get in touch with your neighborhood pipes organisation. The following summary associates with a modern-day high stress (400/600Kpa) system typically made by Kwikot South Africa.

geyser installationgeyser installation


Much less usual are old reduced stress systems (100kpa) open pipe or "Latco" kind systems. Realize that the components are NOT compatible in between both unique systems - High stress and also Low stress! It is possible to eliminate an old reduced pressure system as well as change it with a modern-day high pressure system nonetheless - you buy a new high stress hot spring as well as install it according to the present requirements.



The hot spring sits in a tray made of plastic (typically red) or tin plate. I choose the plastic ones.

Since June 2001, the drip tray is not optional - its obtained to be there and also there has to be a drain pipeline for it! The drain is a 50mm PVC waste pipeline that drains the tray by piping the water out the house (geyser installation).

Unknown Facts About Geyser Installation

The two vacuum breakers stand vertically concerning 30cm over the hot spring. These are vital, as they quit water siphoning out the hot spring when the cold supply is quit - geyser installation.

Keep in mind that vacuum breakers are a fairly new demand - there are still thousands of old HP systems out there without vacuum cleaner breakers and I am yet to see one collapse. Simply because I have not seen it doesn't suggest it's not occurring!

The chilly water side is the side that directly attaches to the drain cock and also goes into the geyser at the bottom. After the turned off valve you would usually locate a Stress Control Valve (PCV). There are a variety of various kinds, mainly made from brass yet some are constructed from plastic.

This is where the PCV launches pressure and also this is the pipe that frequently leaks. Do not stress if you can not locate the PCV next to the geyser - it might be totaled 10 metres away, often in an extra available area on a wall surface outside. In some cases it remains in a little plastic box exterior.

The Geyser Installation Statements

This valve must have a steel (copper or steel) pipeline connected to it as well as the pipeline must lead directly out the building. This air vent pipeline is an important security feature of the whole system.

The T&P shutoff is the least optional component - it has to exist! - The weight of the hot spring should be appropriately sustained on the roofing system trusses - a minimum of two assistances under the 'feet' of the hot spring. If it looks shaky obtain a plumbing professional to examine it out.

This was not a need on old geysers, but it is now as well as it deserves suitable one. The geyser needs to be earthed! I have seen lots of geysers with the planet wire inapplicable. All the try this out copper pipelines must likewise be earthed and also adhered to the hot spring earth. This is not a trivial precaution! Obtain a qualified electrical expert to inspect your setup if the bonding is missing or looks dodgy.


Once again, these are frequently just left lying next to the hot spring. There are basically just two key thermostat kinds - the contemporary round "Kwiktherm" in newer Kwikot hot springs and the VK (rectangular block) kind in older geysers and also in some more recent non-Kwikot units. The hot spring might be fed (chilly water) with polcop (plastic) pipe - as much as the shut down valve, however the pipeline right into and out of the geyser need to be copper or galvanized steel.

The Definitive Guide for Geyser Installation

geyser installationgeyser installation


The warm water side must be copper, steel or appropriately ranked (70) plastic or composite pipe. Keep in mind that you have to contend the very least 1m of copper/steel pipe out the hot spring - you may not connect plastic (compound) pipe straight to the hot spring. As above, the PCV as well as T&P must be constructed from copper or steel - specifically the air vent out of the T&P shutoff.

geyser installationgeyser installation


I have seen a number of setups where the installer has simply run a brief length of 22mm copper right into the drip tray with the suggestion being that the T&P can air vent straight into the drip tray. A suggestion since the warm (100 +) water/steam thaws the drip tray and also the PVC drain pipeline.

The PCV is typically over the geyser as well as the chilly water moves down right into the hot spring. This is rather essential because it creates an anti-syphon loophole that stops the hot spring from draining pipes back with the inlet in the event of a supply visit this page of water failing. If you fume water appearing your cold taps when the supply of water falls short check these guys out after that this is not working appropriately.